Challenge
The project included the conceptual and detailed schematic design of the demolition procedure for the existing concrete box structure over the Grand River. The bridge had to be carefully dismantled to avoid adversely affecting the river’s ecosystem.
Solution
Our team developed a demolition strategy that did not rely on access from the river in order to meet environmental restrictions on in-water work. The developed solution included a sequence of structure removal and stabilization. The implementation of this approach proved crucial when a flash flood of the Grand River brought water to the underside of the existing bridge during the demolition work.
Learn more about how Entuitive approaches engineering challenges, and discover why Engineering Performance matters for your project.
Get in Touch
Interested in learning about how we work? Message us and we will get back to you in a timely manner.