Challenge
The principal challenge for the support of excavation design in all three cases is to provide a shoring system that is both cost-effective and meets the stringent deflection criteria for this type of work. The work must be carefully coordinated with the permanent structure design to facilitate its integration.
Solution
Entuitive has achieved these goals through the application of sophisticated analysis, careful development of staging, and careful review of constructability requirements. Developing the staging for the CP Tunnel was particularly complex because of the very limited closures available and the concerns with track movement.